Lucknow, October 23: Most advanced Electronic Interlocking System has been installed on the Grand Chord route. The measure is expected to help Indian Railways speed up trains and to achieve its future objective of reducing the travel time between Delhi and Howrah to about 12 hours from the existing 17-19 hours.
Grand Chord is part of the Howrah-Gaya-Delhi line and the Howrah-Allahabad-Mumbai line. It acts as a link between Sitarampur, (West Bengal) and Pt. Deen Dayal Upadhyay Junction, Uttar Pradesh, and covers a stretch of 450 km falling in North Central Railway (NCR) Zone of Indian Railways, which maintains and operates 53% portion of this New Delhi-Howrah route. This achievement becomes possible by replacement of the 65-year old outdated Mechanical Signaling System with the most advanced and safer Electronic Interlocking System at Tundla station in Uttar Pradesh now.
Tundla Jn. is an important station on this super-saturated route operating 160% of its designed capacity. Tundla also connects the mainline with Agra Cantt. Jn. This important Electronic Interlocking work at Tundla Jn. was having 613 route combinations which are only second to Kharagpur in South Eastern Railway with 800 routes.
Despite being extremely important from a train operation point of view, Tundla Jn. was still continuing with mechanically interlocked signaling system of 1955 vintage. This system required manual operation of levers for receipt and dispatch of trains from 05 different cabins. Manual operation and coordination among cabins took approximately 05-07 minutes to handle each train at important Jn. station thus limiting its handling capacity to a maximum 190-200 train on a daily basis. Further Mechanical signaling also required an upgrade to match with global safety standards in train operation. The layout of Tundla Jn. also needed important changes to accommodate longer trains and more route combinations for efficient train operations.
With the commissioning of this system and some post-commissioning works expected to be over by 17.11.2019 following major benefits shall be achieved in trains operation:
This work will go a long way in improving punctuality of trains on New Delhi- Howrah mainline benefits shall be manifold during the incoming foggy season through safe and detention free handling of trains at Tundla Jn.